We integrate an electric lifting system for loading and unloading the molds to an IS machine for the manufacture of glass containers. The equipment has a load capacity of 120Kg, this load capacity can be higher or lower depending on each need. The integration of the charging system can be carried out in different IS, with the prior design and approval of our mechanical department. Objective: the reduction of accidents in the manual loading and unloading of heavy items.